Blog Widget by LinkWithin

Friday, May 15, 2009

Loft Progress

Wow! Things are moving fast, now, and we are told that inspection will be May 25th! Michael is working on our bathroom vanities as I type. Yesterday morning we walked over to Urban Synergy to look at paint samples. I then went to the loft and snapped these pictures. The lighting is terrible, so forgive me. Windows are going in! Yay!


The ambrosia maple vanity top for the master bath (it's unfinished):




A peek at the hardwood floors sanded, but unfinished... Yep, original.



Windows going in...










1 comments:

Linda B May 15, 2009 at 3:33 PM  

Fabulous. Very exciting.

The Basics

Michael and Talina Ripper met online and when they met in person, they knew they had found something special, a once in a lifetime love. Michael obtained BFAs in both Wood Design and Ceramics from ECU. Talina has always been a creative/artistic spirit, but has her BSN from ETSU and still works as an RN. Talina has three sons, Seth (17), Aaron (8), and Jacob (7). Michael and Talina have a son together, Quinn, who is 17 months. They are getting settled in their downtown loft just around the corner from Michael's studio and the gallery. Their dream of living their art is coming true!

Followers

More Sponsors:

  © Blogger templates The Professional Template by Ourblogtemplates.com 2008

Back to TOP