Blog Widget by LinkWithin

Tuesday, May 19, 2009

Loft Update -- The Countdown Begins

10 days to go until planned move in! It is hard to keep track of the progress because things are moving so quickly. Floors finished. Or at least here is a picture of them with one coat on. I was told the second coat will be cured in the morning. And below are pictures of the master vanity Michael is building and the loft with the windows in and base cabinets in the kitchen installed. I can't wait for more of the "pretty" stuff to get done. This is when it gets EXCITING!







0 comments:

The Basics

Michael and Talina Ripper met online and when they met in person, they knew they had found something special, a once in a lifetime love. Michael obtained BFAs in both Wood Design and Ceramics from ECU. Talina has always been a creative/artistic spirit, but has her BSN from ETSU and still works as an RN. Talina has three sons, Seth (17), Aaron (8), and Jacob (7). Michael and Talina have a son together, Quinn, who is 17 months. They are getting settled in their downtown loft just around the corner from Michael's studio and the gallery. Their dream of living their art is coming true!

Followers

More Sponsors:

  © Blogger templates The Professional Template by Ourblogtemplates.com 2008

Back to TOP